Real-Time Location Tracking Solutions

RTLS Real-Time Location Tracking System Dashboard for Hospital Asset and Patient Safety

Wireless RTLS Healthcare Alerting Platform for Patients & Assets

  • Long-Range Connectivity: Built upon the latest LoRa radio frequency technology, the Smart Alarm Alert System (SAAS) establishes an expansive wireless call infrastructure delivering reliable communication ranges of up to 10 km.
  • Deployment Flexbility: Designed for rapid installation and intuitive operation, SAAS allows administrators to easily import custom floor maps and configure localized alert audio tracks directly through the interface without code modification.
  • Global Compliance & Trust: Featuring continuous automated system supervision for maximum operational reliability, the solution fully conforms to stringent regulatory safety standards including CE (Europe), FCC/UL (US), UKCA (UK), and HKCA-1078.
25 Inch Medical Digital Signage Monitor and RTLS Location Tracking Display Board

Control Console 25" Display

  • Model: EL-CDU-TV
  • Input power: DC 12V@5A
  • Wall-mount or desktop
  • Call history logs with colorful performance indicator
  • POCSAG pager output (optional)
  • User floor map editable
  • User configurable sound tracks for different alarms
  • Remote Access
  • Duplicates all call information in real-time to multiple locations such as corridors and supervisor roomRemote Access
  • CE and UKCA safety regulations
Wireless Bedhead Call Point Station with Multi-Button Panel for Hospital Patient Care

Wireless Bedhead Call Point

  • Model: EL-WCP
  • Replaceable battery: ER18505 (4000 mAH)
  • Battery life: 1 years (depends on usage)
  • Low battery alert
  • Red and Green re-assurance LED visible alert
  • Buzzer audible alert
  • 6.35mm mono Input Jack for handset / bed pad / floor map
  • Indoor RF range: 100M (open air: 1KM)
  • Radio frequency: 433 / 868 / 915 / 923 (MHz)
  • 5 big and colorful buttons (Emergency, Alarm, Presence, Assistance, Reset)
  • Handset cable length: 2M
  • CE and UKCA safety certified
Wearable Wireless Wristband Panic Button and Patient Tracking Bracelet for RTLS

Mobile Wristband

  • Model: EL-IRX
  • Replaceable battery: CR2477 (1000 mAH)
  • Battery life: 1 years (10 calls per day)
  • Green re-assurance LED visible alert
  • Low battery alert
  • Remove skin alert
  • Indoor IR range: 8M
  • Work with EL-WCP to provide location information
  • IP65 water-proof design
  • CE and UKCA safety certified
Get In Touch
Phone

+(852) 2128 9229

Fax

+(852) 3153 5405

Email

sales@enlightenmed.com.hk

Instant Inquiry
WhatsApp Us

+(852) 9236 2082

Our Location
Hong Kong Office

Room 12, 12/F, Block A,
Profit Industrial Building,
1-15 Kwai Fung Crescent,
Kwai Chung, New Territories,
Hong Kong

© 2026 Enlighten Company Limited. All Rights Reserved.